Home
/
Services
/

Tile Installation Redmond WA

Tile installation · Redmond, Washington

Waterproofed first. Tiled second.

Ask for the assembly spec and we'll happily send it: bonded membrane, pre-sloped base, sealed penetrations, and a 24-hour flood test we photograph before tile goes on. In a Redmond shower, that documentation is the difference between twenty dry years and a five-figure framing repair.

24 hr
Flood test, documented
2 yr
Workmanship warranty
1,000+

Redmond tech floors since 2013

Newly tiled walk-in shower with large-format porcelain in a Redmond home
4.7
★★★★★
119 Google reviews

Family owned · 12 years · Bellevue based

Licensed, bonded & insured · WA OCFLOFL852KQ

Book in about a minute

Pick a time for your free Redmond tile estimate

Pick your free estimate time
Takes about a minute · no deposit, no obligation
Cost, plainly

How much does tile installation cost in Redmond, WA?

For Redmond tile work the budget line reads $14 to $26 a square foot once set — tile, setting mortar, substrate prep and labor bundled, the labor entry starting from $11/sq ft. Standard tub-shower surrounds hold inside the $3,200–$6,800 bracket, while a bathroom done end to end — floor, shower, niche — closes out at $6,500–$14,000.

Here's the variable most spreadsheets miss: format drives labor harder than material price does. A $4 mosaic sheet often costs more to set than large-format porcelain at $12, because the hours follow cuts and grout lines rather than the invoice.

Bathroom floor · 45 sq ft
$900–$1,600
Porcelain, demo and haul-away included.
Tub / shower surround
$3,200–$6,800
Waterproofed assembly, niche, flood test.
Full bathroom · floor + shower
$6,500–$14,000
Four to six working days, start to grout.
Kitchen backsplash · 30 sq ft
$1,100–$2,200
Outlet cuts, edge trim, matched grout.

Figures hold for Redmond as of August 2026, bundling tile with materials and labor. Treat the written quote from the free estimate as the number of record.

The part you never see

What's behind a shower that lasts

Bottom to top, the assembly runs seven layers. When a Redmond shower fails, the post-mortem almost always finds one missing — usually the membrane, trimmed out to save a few hundred bucks on work that later costs five figures to reopen.

7
Grout + silicone
Colour-matched grout; silicone in every change of plane, never grout.
Finish
6
Tile
Porcelain on floors and shower floors. Back-buttered on large format.
Finish
5
Modified thinset
Full coverage — no voids under the tile to hold water or crack.
Setting
4
Bonded waterproof membrane
Sheet or liquid, carried up the walls, corners and pipes sealed.
Critical
3
24-hour flood test
Plugged, filled, left overnight, photographed. Before any tile.
Critical
2
Pre-sloped base + backer
Positive slope to the drain, cement backer board, blocking behind.
Structure
1
Sound framing & subfloor
Deflection checked, rot repaired, subfloor flattened first.
Structure
Assembly per TCNA / ANSI A118.10 practice. We photograph layers 2–4 before they disappear.
Why it matters

Leaks run silent for years. Moisture slips past grout, saturates the substrate, and only surfaces as a soft hallway floor or a ceiling stain on the level below. At that point you're paying for framing, subfloor, drywall and a complete re-tile.

Run the numbers: waterproofing is roughly 10% of a shower's cost, and deleting it is the most expensive line-item cut in remodeling.

Bonded waterproofing membrane and flood test in progress before tiling a Redmond shower
Scope & starting prices

What we tile in Redmond

Every price below is a starting point — format, substrate condition and layout complexity move it. Your exact figure is written on site, free.

Most requested

Shower & bath tile

Pre-slope, bonded membrane, documented flood test, niche, curb or curbless — the full spec, then tile. What you're really buying is the layer you'll never see.

from $3,200 / shower
Floors

Porcelain & stone floors

Kitchen, bath, entry, mudroom or basement — the subfloor gets trued flat before anything else, with uncoupling membrane specified where movement or a radiant mat calls for it.

from $11 / sq ft labor
Kitchens

Backsplash

Classic subway through herringbone, mosaic sheet and slab-look porcelain. Outlets cut clean, edges finished with proper trim, grout selected to suit the counter instead of the carton.

from $1,100 / backsplash
Upgrade

Heated tile floors

Radiant mat on an uncoupling membrane, resistance-tested before and after tile, wired to a dedicated circuit — and yes, it pairs with a smart thermostat. Do it while the floor is open.

from $11 / sq ft added
Repairs

Tile repair & regrout

Loose corners, failed grout, a cracked tile or two. We'll diagnose honestly: a true repair, or a substrate that has already let go underneath.

from $8 / sq ft
Prep

Demo & haul-away

Tile, thinset and backer board out; dust held behind sheeting with negative air; everything hauled the same day. Your driveway stays clear.

from $3.50 / sq ft
Material guide

Which tile, and where

Redmond's usual tile mistake isn't a bad product — it's a correct product spec'd into the wrong room. What follows is the compressed version of the talk we'd otherwise give in your bathroom.

Material
Best for
Avoid
What it costs you later
Porcelain
$3–$14 / sf
Floors, shower floors, wet rooms, high traffic
Nothing structural — it is the default for a reason
Least maintenance of anything here. Under 0.5% water absorption.
Ceramic
$2–$8 / sf
Walls, backsplash, tub surrounds
Floors, and anywhere heavy things get dropped
Chips show the clay body underneath. Cheap to buy, cheap to replace.
Natural stone
$8–$30 / sf
Feature walls, entries, statement floors
Shower floors and kitchen backsplash behind a range
Needs sealing every 1–3 years. Marble etches from anything acidic.
Glass mosaic
$10–$28 / sf
Niches, accent bands, backsplash
Floors — and any large uninterrupted area
Labor-heavy to set, but nothing else holds colour like it.
Zellige / handmade
$14–$40 / sf
Backsplash and walls you want to look alive
Anywhere you want a perfectly flat, uniform surface
Variation and lippage are the point. Budget extra labor, not extra tile.

Material-only rates, before install. We bring samples and tell you exactly where each one justifies its price.

Redmond tile cost calculator

Price your tile job before we arrive

Scope, square footage, format, prep — the same variables we run on site. Not a quote, but accurate enough to budget against.

Schedule

A bathroom, day by day

The standard Redmond bathroom spans four to six working days, and the seemingly idle pair mid-schedule belongs to the waterproofing — precisely why the finished job lasts.

01
Demo & protection
Floor paths covered, doorways sheeted, negative air on. Old tile, thinset and backer out to bare framing, and the first honest look at the subfloor.
02
Substrate & waterproofing
Rot repaired, backer board set, pre-slope built, membrane bonded and every corner and penetration sealed. Then the flood test goes in and sits overnight.
03
Flood test cleared, tile starts
We photograph the test, drain it, and start setting — layout dry-laid first so cuts land where you'd want them, not where they fall.
04
Tile finished
Walls, floor, niche and edge trim complete. Large format back-buttered, lippage checked as we go rather than at the end.
05
Grout, silicone, done
Grout, then silicone in every change of plane. 24 hours of cure before you use the shower, and we walk it with you before we invoice.
Recent work

Recent tile work around the Eastside

Full gallery →
Large-format porcelain bathroom floor installed during a Redmond remodel
Herringbone kitchen backsplash tiled in a Redmond home near Education Hill
Heated tile floor with smart thermostat installed in a Redmond ensuite
Curbless tiled shower with linear drain in a Redmond master bathroom
Tub surround retiled with subway tile in a Redmond family bathroom
4.7 ★ · 119 Google reviews

Reviews from Eastside tile clients

Read all reviews →
★★★★★

“They placed plastic sheeting over the cabinets to contain the dust, so we noticed hardly any. The floors look as good or better than new.”

Richard L. · Bellevue · Google
★★★★★

“We chose them because they were professional and top-notch. The work was smooth, fast and cost-effective — such skill and precision!”

Jasen H. · floor repair · Google
★★★★★

“The installers were great! The floor is exactly what we wanted. We worked with OC Flooring previously — highly recommend.”

Deborah C. · stairs & refinishing · Google
Straight answers

Tile installation FAQ — Redmond, WA

Not here? Call us at (425) 595-1079 — you'll get an installer on the phone, not a call center.

How much does tile installation cost in Redmond, WA?

+

Redmond installs work out between $14 and $26 per square foot once set, with tile, setting materials, prep and labor all inside — labor entering the sheet at $11 per square foot. Surrounds for a standard tub-shower hold inside the $3,200–$6,800 bracket; a roughly 45 sq ft bathroom floor holds near $900–$1,600; and taking the bathroom end to end — floor, shower, niche — closes out at $6,500–$14,000. Watch format above all: mosaics and oversized planks each burn considerably more labor per installed foot than plain-grid 12×12.

How much does it cost to tile a shower in Redmond?

+

A standard alcove shower in Redmond holds inside the $3,200–$6,800 bracket, with demolition, the bonded waterproofing spec, a pre-sloped pan, the tile, a niche and grout all accounted for. Steam, benches, curbless thresholds and stone run to the ceiling move the spec — and the price — upward. Waterproofing itself claims about a tenth of the budget, and that same tenth removes the five-figure failure mode from the table.

Do you waterproof showers before tiling?

+

Always — and the spec sheet is yours for the asking. Each shower is built to ANSI A118.10 and TCNA guidance as a bonded membrane system: pre-sloped base, membrane climbing the walls, with seams, corners and penetrations all sealed, then a 24-hour flood test held and photographed before setting starts. Tile and grout merely delay water; the stopping is work the membrane performs alone.

How long does a bathroom tile job take?

+

Normal course for a Redmond bathroom is four to six working days, with demolition and dust control opening the job. Substrate and membrane work follow, the 24-hour flood test standing overnight; setting occupies another day or two; the last day goes to grout, silicone and trim. Hold off 24 hours after grouting for cure before anyone showers. On its own, a floor tends to finish inside two days.

Porcelain or ceramic tile — which is better?

+

Wherever water or foot traffic is involved, spec porcelain: the denser body chips less and holds absorption under 0.5%. Ceramic remains a sound, cheaper pick for walls and backsplashes. The default Redmond spec reads porcelain across every floor and shower floor, with ceramic and glass winning wall space when the design argues for them.

Can you install a heated tile floor?

+

Yes — and Redmond being Redmond, the smart-thermostat request usually arrives with it; we wire those in gladly. Heated tile prices at $11 to $16 per square foot of finished floor, thermostat counted in. The mat rests on uncoupling membrane, gets its resistance verified both sides of the setting work, and claims a dedicated circuit. Decide early, though — the economics hold only while the floor is open.

Do I need to remove the old tile first?

+

Nine jobs in ten, out it comes. Figure about $3.50 a square foot for tear-out with hauling, and treat demolition as the inspection it really is — the sole way to check the subfloor for rot or movement and keep finished height sane where doorways land. Going over existing tile occasionally works on a flat, sound, bonded surface, yet it stacks the floor higher and hides exactly what demo would have caught.

How much does a kitchen backsplash cost in Redmond?

+

Backsplash math for Redmond: a standard run near 30 square feet prices between $1,100 and $2,200 installed — outlet cutting, edge trim and color-keyed grout inside the figure. What pushes an install toward the ceiling of the range is layout — herringbone, mosaic sheets, a framed panel over the range, slab-look porcelain floor to ceiling — since cutting time, not material, sets the labor.

Can you fix cracked tile or regrout instead of replacing?

+

Frequently. Repair and regrout opens its pricing at $8 per square foot, fitting grout that has stained or begun failing, one or two tiles split by an impact, and shower corners overdue for silicone. It stops making sense once the substrate quits: tile that thuds hollow, pieces working loose in a pattern, any flex in the wall. That's replacement territory, and we say so plainly before a price is quoted.

Which Redmond neighborhoods do you tile?

+

All of Redmond is in range — Downtown, Education Hill, Grass Lawn, Overlake, Idylwood, Viewpoint, the Sammamish Valley, Bear Creek, North Redmond, English Hill, Willows/Rose Hill, Southeast Redmond and Marymoor Village, plus Redmond Ridge, Union Hill and Novelty Hill east of town. Kirkland, Bellevue, Sammamish, Woodinville and the rest of the Eastside are regular territory too.

What warranty comes with tile installation?

+

Workmanship on our tile carries a 2-year warranty — twice what carpet gets, since tile trouble prefers the second year to the second week. Choose a manufacturer's complete waterproofing assembly and the maker's system coverage stacks over ours. Every membrane and flood test is photographed too, so dated proof of what sits behind the tile is yours on the day you sell.

No appointment needed

Send photos of your bathroom, floor or backsplash. Get a real tile quote by email today.

Photograph the shower, the floor or the wall you want tiled — on your phone or upload from your computer. One of our estimators looks at every photo personally and emails you a written price the same business day — no visit, no sales call, no obligation.

Drag your photos here, or tap to browse
Even one photo helps. Three is ideal: a close-up of the area, one from a few feet back, and one of the whole room. Up to 8 · JPG, PNG or HEIC.
Add a photo and we'll ask for your name, email and phone next — two more taps.
Same dayA written price in your inbox, not a callback
A person, not a botEvery photo reviewed by one of our estimators
No obligationLicensed and insured · 2-year workmanship warranty
Service area

Redmond neighborhoods we tile

Downtown Redmond

Education Hill

Grass Lawn

Overlake

Idylwood

Viewpoint

Sammamish Valley

Bear Creek

North Redmond

English Hill

Willows/Rose Hill

Southeast Redmond

Marymoor Village

Redmond Ridge

Union Hill

Novelty Hill

Missing your neighborhood? An hour's radius around Redmond is all workable — say where you are when booking.

Also see our carpet installation in Redmond, hardwood floor installation, flooring products and financing options.

Get a shower spec'd to stay watertight into the 2040s

One visit: substrate check, format and layout talk, and a written price backed by a 4.7★ · 119-review Google record. Free, with zero pressure to decide same-day.

Rather talk it through first?
Call (425) 595-1079

Tile installation in Redmond, WA · Licensed, bonded & insured · WA Reg # OCFLOFL852KQ · 2-year workmanship warranty

Proudly Serving Homeowners Across King & Snohomish Counties